|
|
|
|
|
| Treat
vertical surfaces first. Start by applying DEFY and undersides of
upper level decks (only one coat is required on undersides). Once
underside is treated, immediately brush out all overspray, drips,
itc. on top deck.
|
| |
| Railings:
Start from the bottom and work up. Treat the entire length of a board
before moving up. If necessary, brush or feather in to avoid lap marks.
Brush or roll in poduct before it dries and work out all drips, runs,
or overspray. |
|
|
|
|
|
|
|
|
|
|
|
|